Bjørnøya Wind Farm

GPTKB entity

Statements (46)
Predicate Object
gptkbp:instance_of gptkb:wind
gptkbp:armament 45 m
gptkbp:benefits Provides funding for local projects
gptkbp:capacity 23 MW
gptkbp:certification gptkb:ISO_14001
gptkbp:climate_impact Operational during most weather conditions
Contributes to climate change mitigation
gptkbp:collaborations Collaborates with local universities
gptkbp:community_engagement Local consultations held
gptkbp:developer gptkb:Chakra
gptkbp:development_cost estimated at 200 million NOK
gptkbp:disbandment_date In place
gptkbp:emissions_standard Reduces CO2 emissions by 40,000 tons annually
gptkbp:environmental_impact Completed
gptkbp:funding Partially funded by Norwegian government
gptkbp:grid_position Norwegian power grid
Connected to 132 k V grid
Integrated with local energy market
https://www.w3.org/2000/01/rdf-schema#label Bjørnøya Wind Farm
gptkbp:is_monitored_by Installed for performance tracking
gptkbp:local_economy Creates local jobs
gptkbp:location Bjørnøya, Norway
gptkbp:maintenance gptkb:Chakra
gptkbp:max_speed 7.5 m/s
gptkbp:operational_since gptkb:2010
gptkbp:operational_use Managed by Statkraft
gptkbp:owner gptkb:Chakra
gptkbp:power_source Renewable energy
approximately 60 GWh
Sufficient to power 10,000 homes
gptkbp:project Operational
Completed in 2010
gptkbp:public_access Limited access due to safety regulations
gptkbp:revenue Electricity sales
gptkbp:safety_measures Regular safety drills conducted
gptkbp:technology Onshore wind power
gptkbp:turbine_type gptkb:10
gptkb:Siemens_SWT-2.3-93
gptkb:Siemens
100 m
Commercial wind farm
gptkbp:water_resistance Conducted prior to construction
gptkbp:wind_farm_capacity_factor Approximately 30%
gptkbp:year_created 2010-12-01
gptkbp:bfsParent gptkb:Equinor
gptkbp:bfsLayer 6